Products
Showing 97–112 of 131 results
-
CCA Complete EV
$330.00 – $440.00Complete set of available CCA Documents and Guides – Electronic Version – comes with two seals per document
-
CCDC 45 [Document HC]
$27.50 – $36.30DOCUMENT: Guide to the use of CCDC 5A-2010 – Hard Copy
-
CCDC 45 [Document EV]
$19.80 – $27.50DOCUMENT: Guide to the use of CCDC 5A-2010 – Electronic Version (no seal required)
-
CCDC 46 [Document HC]
$27.50 – $36.30DOCUMENT: Guide to the use of CCDC 5B-2010 – Hard Copy
-
CCDC 46 [Document EV]
$19.80 – $27.50DOCUMENT: Guide to the use of CCDC 5B-2010 Electronic Version (no seal required)
-
CCDC 47 [Document HC]
$27.50 – $36.30DOCUMENT: Guide to the use of CCDC 17-2010 – Hard Copy
-
CCDC 47 [Document EV]
$19.80 – $27.50DOCUMENT: Guide to the use of CCDC 17-2010 – Electronic Version (no seal required)
-
CCDC 48 [Document HC]
$27.50 – $36.30DOCUMENT: A Guide to the use of CCDC 18 Civil Works Contract (2001) – Hard Copy
-
CCDC 48 [Document EV]
$19.80 – $27.50DOCUMENT: A Guide to the use of CCDC 18 (2001) Civil Works Contract – Electronic Version – no authorization seal required
-
CCDC 220 [Document HC]
$5.00 – $8.00DOCUMENT: Bid Bond (2002) – Only Available in Hard Copy
-
CCDC 221 [Document HC]
$5.00 – $8.00DOCUMENT: Performance Bond (2002) – Only Available in Hard Copy
-
CCDC 222 [Document HC]
$5.00 – $8.00DOCUMENT: Labour and Material Payment Bond (2002) – Only Available in Hard Copy
-
CCDC Complete – FRENCH (Electronic Version)
$475.00 – $575.00Complete set of available CCDC Documents and Guides – FRENCH (Electronic Version)
-
CCDC Complete EV
$475.00 – $575.00Complete set of available CCDC Documents and Guides – Electronic Version – comes with two seals per document (Note: CCDC 4 is not included in the Electronic Version)
-
OGCA 100 – OAA / OGCA Takeover Procedures FOR PROJECTS UNDER THE CONSTRUCTION ACT (after July 1, 2018)
$6.00 – $15.00OAA / OGCA Takeover Procedures (2018) FOR PROJECTS UNDER THE CONSTRUCTION ACT (after to July 1, 2018). – Available in Hard Copy or .pdf
This document has been revised for use on projects prior to July 1, 2018 (CONSTRUCTION LIEN ACT) and those after July 1, 2018 (CONSTRUCTION ACT).
-
OGCA 100 – OAA / OGCA Takeover Procedures FOR PROJECTS UNDER THE CONSTRUCTION LIEN ACT (prior to July 1, 2018)
$6.00 – $15.00OAA / OGCA Takeover Procedures (2018) FOR PROJECTS UNDER THE CONSTRUCTION LIEN ACT (prior to July 1, 2018). – Available in Hard Copy or .pdf
This document has been revised for use on projects prior to July 1, 2018 (CONSTRUCTION LIEN ACT) and those after July 1, 2018 (CONSTRUCTION ACT).