180 Attwell Drive, Suite 280 Toronto, Ontario M9W 6A9(905) 671-3969
Posted on June 9, 2015 in News
A 10-year old legal decision has stirred fresh debate about whether general contractors should be asked to name subtrades at bid closing time.
Download the PDF